Wind farms
Handstedt II (Germany)| Handstedt II (Germany) |
|
| Operational (19,5 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Uelzen - Wrestedt |
| Wind farm type | Onshore wind farm |

![]() | 18 MW commissioned |
![]() | 1.5 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | GE Vernova 1.5sl (x 12) |
| Operational | Repower MD77 (x 1) |

| No source available |

| City | Wrestedt |
| Commissioning | ![]() |
| Turbine | 1x Repower MD77 (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Coordinates | Latitude 52° 56' 30.8" - Longitude 10° 38' 44.3" |
| Precise localization | No |
| City | Uelzen |
| Commissioning | ![]() |
| Turbines | 12x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 18,000 kW |
| Status | Operational |
| Coordinates | Latitude 52° 49' 31.9" - Longitude 10° 33' 29" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Wettendorf-Bottendorf (7 km) Hankensbüttel (7 km) Steimke (9 km) Wrestedt (9 km) Harsahl (9 km) Bad Bodenteich (9 km) Bokel (Niedersachsen) (11 km) Langenbrügge (11 km) Halligdorf (13 km) Soltendieck (13 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 September 2022 |
||