Wind farms
Bad Bodenteich (Germany)| Bad Bodenteich (Germany) |
|
| Operational (16,5 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Bad Bodenteich |
| Wind farm type | Onshore wind farm |

![]() | 5.5 MW commissioned |
![]() | 11 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 5.5-158 (x 3) |

| No source available |

| City | Bad Bodenteich |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 5.5-158 (power 5,500 kW, diameter 158 m) |
| Hub height | ![]() |
| Total nominal power | 5,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 50' 45.3" - Longitude 10° 41' 31" |
| Precise localization | No |
| City | Bad Bodenteich |
| Commissioning | ![]() |
| Turbines | 2x GE Vernova 5.5-158 (power 5,500 kW, diameter 158 m) |
| Hub height | ![]() |
| Total nominal power | 11,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 50' 45.3" - Longitude 10° 41' 31" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Soltendieck (4 km) Langenbrügge (6 km) Handstedt II (9 km) Wrestedt (10 km) Stöcken (11 km) Hanstedt II (11 km) Halligdorf (12 km) Steimke (13 km) Wettendorf-Bottendorf (13 km) Wellendorf (13 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 June 2025 |
||