[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Lehrte
- City: Sehnde
- Commissioning:

- 3 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Windwärts
Production forecast
- From Wednesday, March 03 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 9.4 %
- Expected production: 3,370 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Lehrte
- City: Sehnde
- Commissioning:

- 2 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, March 03 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 9.2 %
- Expected production: 6,650 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Lehrte
- Latitude: 52° 17' 23.3"
- Longitude: 9° 55' 16.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Lehrte
- Latitude: 52° 17' 8.1"
- Longitude: 9° 55' 13.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 March 2019
Complete/correct this sheet: