[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Lehrte
- City: Sehnde
- Commissioning:

- 3 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Windwärts
Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 16 %
- Expected production: 5,760 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Lehrte
- City: Sehnde
- Commissioning:

- 2 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 16.5 %
- Expected production: 11,900 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Lehrte
- Latitude: 52° 17' 23.3"
- Longitude: 9° 55' 16.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Lehrte
- Latitude: 52° 17' 8.1"
- Longitude: 9° 55' 13.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: