[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Walldürn
- Commissioning:

- 3 turbines: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.5 %
- Expected production: 10,260 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Eichenbühl
- Commissioning:

- 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Hardheim
- Commissioning:

- 2 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:

- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 49° 34' 55"
- Longitude: 9° 22' 13.3"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 49° 38' 46.6"
- Longitude: 9° 24' 7.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 49° 38' 57.4"
- Longitude: 9° 24' 15.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 25 May 2022
Complete/correct this sheet: