[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Hanni
- City: Hamburg
- Commissioning:

- 1 turbine: Vestas V117/3300 (power 3 300 kW, diameter 117 m)
- Hub height:

- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, December 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0.2 %
- Expected production: 150 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Nanni
- City: Hamburg
- Commissioning:

- 1 turbine: Vestas V117/3300 (power 3 300 kW, diameter 117 m)
- Hub height:

- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, December 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.7 %
- Expected production: 17,970 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Hanni
- Latitude: 53° 29' 57.1"
- Longitude: 9° 51' 22.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Nanni
- Latitude: 53° 29' 47.9"
- Longitude: 9° 51' 19.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 May 2022
Complete/correct this sheet: