Part #1:
- City: Land Wursten
- Commissioning:

- 7 turbines: Enercon E66/1500 (power 1 500 kW, diameter 66 m)
- Hub height:

- Total nominal power: 10,500 kW
- Operational
- Onshore wind farm
- Developer: UTEC
- Operator: Tandem GmbH
- Source:

- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 5.5 %
- Expected production: 13,750 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Langen, Land Wursten
- Commissioning:

- 3 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Developer: UTEC
- Operator: Tandem GmbH
- Source:

- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 5.7 %
- Expected production: 9,400 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 40' 22.7"
- Longitude: 8° 35' 21.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 40' 22.7"
- Longitude: 8° 35' 21.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 November 2022