[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Geestland
- Commissioning:

- 1 turbine: Enercon E112/6000 (power 6 000 kW, diameter 114 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Alterric
Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 77.3 %
- Expected production: 111,270 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Geestland
- Commissioning:

- 1 turbine: Enercon E126/6000 (power 6 000 kW, diameter 127 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Alterric
Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 68.2 %
- Expected production: 98,190 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Geestland
- Commissioning:

- 2 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Alterric
Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 29.6 %
- Expected production: 42,670 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Geestland
- Commissioning:

- 2 turbines: Nordex N117/3600 (power 3 600 kW, diameter 117 m)
- Hub height:

- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Developer: PNE
- Source:

Localisation
Part #1:
- Latitude: 53° 39' 10.7"
- Longitude: 8° 42' 7.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 39' 18.5"
- Longitude: 8° 42' 35.3"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 38' 56.4"
- Longitude: 8° 43' 54.3"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 53° 41' 20.4"
- Longitude: 8° 40' 15.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 22 November 2022
Complete/correct this sheet: