Arada-Montemuro (Portugal)| Arada-Montemuro (Portugal) |
|
| Operational (133,15 MW) |

| Country | Portugal |
| County/Zone | Viseu (Centro/Norte) |
| City | Castro Daire |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 22 MW commissioned |
![]() | 34 MW commissioned |
![]() | 50 MW commissioned |
![]() | 4.7 MW commissioned |
![]() | 4.7 MW commissioned |
![]() | 9.4 MW commissioned |
![]() | 2.35 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E82/2000 (x 56) |
| Operational | Enercon E92/2350 (x 9) |

![]() | |

| Part | Arada |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 25x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Aveloso |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 3x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Cabria |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 4x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 9,400 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Carvalhosa |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 2x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Carvalhosa |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 11x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Total nominal power | 22,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Manhouce |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 2x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Picao |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 17x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Total nominal power | 34,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
| Part | Picao |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbine | 1x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 2,350 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 40° 57' 55.6" - Longitude -8° 1' 45.8" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lameira (1 km) Sobrado (1 km) Cabril (2 km) Bustelo (PT) (5 km) Alto do Côto (6 km) Sao Pedro (6 km) Casais (7 km) Fonte da Quelha (8 km) Cinfaes (8 km) Lagoa D. Joao e Feirao (11 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Viseu (Centro/Norte) : 1,161.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||