- City: Großtreben
- Commissioning:

- 1 turbine: Dewind D6-1000 (power 1 000 kW, diameter 62 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
- Operator: e.n.o. Energy
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 10 %
- Expected production: 2,400 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 7.5 %
- Expected production: 7,050 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Beilrode
- Commissioning:

- 1 turbine: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:

- Total nominal power: 1,300 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 14.8 %
- Expected production: 4,630 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 36' 54"
- Longitude: 12° 56' 19.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 38' 56"
- Longitude: 13° 0' 17.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 38' 37"
- Longitude: 12° 59' 59.7"
- Geodetic system: WGS84
- Precise localization: no