[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Nordwestuckermark
- Commissioning:

- 7 turbines: Windstrom Frisia F48 (power 750 kW, diameter 48 m)
- Hub height:

- Total nominal power: 5,250 kW
- Dismantled
- Onshore wind farm
- Developer: WPD
- Source:

- Source:

Part #2:
- City: Prenzlau
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, February 4 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 40.9 %
- Expected production: 22,560 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Prenzlau
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, February 4 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 68.2 %
- Expected production: 12,280 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Prenzlau
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Dismantled (2020/12)
- Onshore wind farm
Part #5:
- City: Nordwestuckermark
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Dismantled (2020/12)
- Onshore wind farm
Part #6:
- City: Prenzlau
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, February 4 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 57.2 %
- Expected production: 10,300 kWh
- Values from Weathernews Windcaster solution
Part #7:
- City: Nordwestuckermark
- Commissioning:

- Turbine(s): Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Dismantled (2021/01)
- Onshore wind farm
Part #8:
- City: Prenzlau
- Commissioning:

- 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Total nominal power: 4,700 kW
- Operational
- Onshore wind farm
- Developer: IFE Eriksen
- Operator: IFE Eriksen
- Owner:

- Source:

Part #9:
- City: Güstow
- Commissioning:

- 1 turbine: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Hub height:

- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Developer: Notus
- Operator: Notus
- Owner:

- Source:

Part #10:
- City: Prenzlau
- Commissioning:

- 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
- Hub height:

- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
- Developer: MLK Windpark
- Operator: MLK Windpark
Part #11:
- Part: Lindenberg
- City: Prenzlau
- Commissioning:

- 2 turbines: BWU BWU 48-600 (power 600 kW, diameter 48.4 m)
- Hub height:

- Total nominal power: 1,200 kW
- Dismantled (2020)
- Onshore wind farm
- Developer: Denker&Wulf
Part #12:
- Part: Lindenberg
- City: Prenzlau
- Commissioning:

- 8 turbines: BWU BWU 48-600 (power 600 kW, diameter 48.4 m)
- Hub height:

- Total nominal power: 4,800 kW
- Dismantled (2020)
- Onshore wind farm
- Developer: Denker&Wulf
Localisation
Part #1:
- Latitude: 53° 19' 2.2"
- Longitude: 13° 46' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 19' 38.2"
- Longitude: 13° 46' 16.3"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 19' 50.9"
- Longitude: 13° 46' 22.1"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 53° 19' 42.1"
- Longitude: 13° 45' 45.6"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 53° 19' 47.9"
- Longitude: 13° 45' 49.6"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 53° 19' 47.7"
- Longitude: 13° 46' 31.8"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 53° 19' 51.6"
- Longitude: 13° 45' 38.6"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 53° 19' 2.2"
- Longitude: 13° 46' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 53° 19' 2.2"
- Longitude: 13° 46' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 53° 19' 2.2"
- Longitude: 13° 46' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Part: Lindenberg
- Latitude: 53° 19' 40.3"
- Longitude: 13° 45' 59.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #12:
- Part: Lindenberg
- Latitude: 53° 19' 40.3"
- Longitude: 13° 45' 59.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 9 November 2022
Complete/correct this sheet: