[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hörup
- Commissioning: 2012/02
- 1 turbine: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Hub height: 59 m
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Developer: Geo Mbh
- Source: http://www.geo-mbh.de/index.php?id=98
Production forecast
- From Wednesday, December 11 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 48.8 %
- Expected production: 24,010 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Hörup
- Commissioning: 2012/02
- 2 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height: 78 m
- Total nominal power: 6,800 kW
- Operational
- Onshore wind farm
- Developer: Geo Mbh
- Source: http://www.geo-mbh.de/index.php?id=98
Production forecast
- From Wednesday, December 11 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 47.7 %
- Expected production: 77,890 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 43' 41.8"
- Longitude: 9° 7' 4.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 43' 41.8"
- Longitude: 9° 7' 4.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 8 October 2019
Complete/correct this sheet: