[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Bremen Mahndorf
- City: Bremen
- Commissioning:

- 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 25.9 %
- Expected production: 71,470 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Bremen-Mahndorf
- City: Bremen
- Commissioning:

- 5 turbines: Bonus B76/2000 (power 2 000 kW, diameter 76 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: NewEN
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 26.5 %
- Expected production: 63,650 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Bremen Mahndorf
- Latitude: 53° 1' 23.5"
- Longitude: 8° 55' 54.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Bremen-Mahndorf
- Latitude: 53° 1' 37.2"
- Longitude: 8° 56' 4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 9 November 2022
Complete/correct this sheet: