The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English Français Deutsch Español 

Online access Wind farms Lüdersdorf (Brandenburg) (Germany)


Previous page
Sign up    Log in    Search


Lüdersdorf (Brandenburg) (Germany)
Operational (72,1 MW) - Dismantled (1 MW)


Localisation  

Country Germany
County/Zone Brandenburg
City Am Mellensee - Luckenwalde - Reichenow-Möglin - Trebbin - Wriezen
Wind farm type Onshore wind farm

Key dates  

 1 MW commissioned
 20 MW commissioned
 8 MW commissioned
 2 MW commissioned
 6.15 MW commissioned
 16.5 MW commissioned
 6.6 MW commissioned
 9.4 MW commissioned
 3.45 MW commissioned
 1 MW decommissioned

Players  

Developers
#ND
Operators

#ND
Owners




#ND
Manufacturers Enercon
Vestas

Turbines   

OperationalVestas V80/2000 (x 10)
OperationalVestas V112/3300 (x 7)
OperationalVestas V90/2000 (x 5)
OperationalEnercon E92/2350 (x 4)
OperationalVestas V112/3075 (x 2)
OperationalVestas V112/3450 (x 1)
DismantledEnercon E40/500 (x 2)

Sources  

 
 
 
 

Details  

Part #1



CityReichenow-Möglin
Commissioning
Turbine1x Vestas V90/2000 (power 2,000 kW, diameter 90 m)
Hub height
Total nominal power2,000 kW
StatusOperational
OwnerND
CoordinatesLatitude 52° 41' 17.6" - Longitude 14° 3' 50.4"
Precise localizationNo

Part #2



CityReichenow-Möglin
Commissioning
Turbines2x Vestas V112/3075 (power 3,075 kW, diameter 112 m)
Hub height
Total nominal power6,150 kW
StatusOperational
OwnerND
CoordinatesLatitude 52° 41' 17.6" - Longitude 14° 3' 50.4"
Precise localizationNo

Part #3



CityWriezen
Commissioning
Turbine1x Vestas V112/3450 (power 3,450 kW, diameter 112 m)
Hub height
Total nominal power3,450 kW
StatusOperational
CoordinatesLatitude 52° 41' 13.1" - Longitude 14° 3' 57.6"
Precise localizationNo

Part #4



PartChristinendorf
CityTrebbin
Commissioning
Turbines2x Enercon E40/500 (power 500 kW, diameter 40 m)
Hub height
Total nominal power1,000 kW
StatusDismantled
CoordinatesLatitude 52° 11' 48.9" - Longitude 13° 17' 25.5"
Precise localizationYes

Part #5



PartChristinendorf
CityTrebbin
Commissioning
Turbines4x Enercon E92/2350 (power 2,350 kW, diameter 92 m)
Hub height
Total nominal power9,400 kW
StatusOperational
OperatorND
OwnerND
CoordinatesLatitude 52° 12' 36.7" - Longitude 13° 18' 21.4"
Precise localizationYes

Part #6



PartChristinendorf-Lüdersdorf
CityTrebbin, Am Mellensee
Commissioning
Turbines5x Vestas V112/3300 (power 3,300 kW, diameter 112 m)
Hub height
Total nominal power16,500 kW
StatusOperational
Developer
Operator
Owner
CoordinatesLatitude 52° 12' 8.9" - Longitude 13° 18' 8.9"
Precise localizationYes

Part #7



PartTrebbin
CityLuckenwalde
Commissioning
Turbines4x Vestas V90/2000 (power 2,000 kW, diameter 90 m)
Hub height
Total nominal power8,000 kW
StatusOperational
Developer
Operator
Owner
CoordinatesLatitude 52° 12' 5.7" - Longitude 13° 17' 25.8"
Precise localizationYes

Part #8



PartWriezener Höhe
CityWriezen
Commissioning
Turbines10x Vestas V80/2000 (power 2,000 kW, diameter 80 m)
Hub height
Total nominal power20,000 kW
StatusOperational
OwnerND
CoordinatesLatitude 52° 41' 11.1" - Longitude 14° 4' 4.5"
Precise localizationYes

Part #9



PartWriezener Höhe
CityWriezen
Commissioning
Turbines2x Vestas V112/3300 (power 3,300 kW, diameter 112 m)
Hub height
Total nominal power6,600 kW
StatusOperational
OwnerND
CoordinatesLatitude 52° 41' 11.1" - Longitude 14° 4' 4.5"
Precise localizationYes

Databases

     

Germany (104.2 GW)
Europe (654.1 GW)
World (2,450.5 GW)

All databases



PDF Summary




Nearby wind farms

Frankenfelde (0 km)
Wriezener Höhe (0 km)
Wriezen-Lüdersdorf (1 km)
Wriezen (1 km)
Schulzendorf (2 km)
Prötzel I (5 km)
Prötzel III (6 km)
Prötzel II (6 km)
Prötzel (6 km)
Bliesdorf Lichterfelde (7 km)


Insights

Production capacity

Germany : 77,691.0 MW (end of 2025)
Brandenburg : 10,012.1 MW (*)


Légende

#ND : no data
(*) : according to The Wind Power database


Update for this sheet

18 January 2026




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page