[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Riegenroth
- Commissioning:

- 3 turbines: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
- Hub height:

- Total nominal power: 9,600 kW
- Operational
- Onshore wind farm
- Owner:

Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 10 %
- Expected production: 23,030 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Riegenroth
- Commissioning:

- 2 turbines: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
- Hub height:

- Total nominal power: 6,400 kW
- Operational
- Onshore wind farm
- Owner:

Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 28.7 %
- Expected production: 44,120 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 4' 8.2"
- Longitude: 7° 34' 59.7"
- Altitude: 470 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 50° 4' 8.2"
- Longitude: 7° 34' 59.7"
- Altitude: 470 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: