Generalities
|
|
Details
- City: Kretzschau
- Commissioning: 2001
- 3 turbines: Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developers: PNE/PSEEG
- Source: http://www.pnewind.com/unternehmen/referenzen/
- Source: http://www.pseeg.de/referenzen.html
Production forecast
- From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 15.6 %
- Expected production: 6,720 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 51° 2' 58"
- Longitude: 12° 5' 38.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 September 2019