Wind farms
Era del Pico (Spain)| Era del Pico (Spain) |
|
| Operational (11,9 MW) |

| Country | Spain |
| County/Zone | Leon (Castilla y Leon) |
| City | Bierzo - Castropodame - Mallonseca - T |
| Wind farm type | Onshore wind farm |

![]() | 8.5 MW commissioned |
![]() | 3.4 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 10) |
| Operational | Gamesa G52/850 (x 4) |

| No source available |

| City | Mallonseca, Castropodame, T,Bierzo |
| Commissioning | ![]() |
| Turbines | 10x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 8,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 34' 12" - Longitude -6° 34' 48" |
| Precise localization | No |
| City | Mallonseca, Castropodame, T,Bierzo |
| Commissioning | ![]() |
| Turbines | 4x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 3,400 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 34' 12" - Longitude -6° 34' 48" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms San Pedro (ES) (10 km) El Redondal Fase 2 (13 km) El Redondal Fase 1 (13 km) Lucillo (18 km) Cerro Becerril (18 km) Argañoso (24 km) Valdelón (27 km) Valdelón Ampliación (27 km) La Mallada (29 km) El Pedrón (31 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 454.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||