Generalities
|
|
Details
Part #1:
- City: Boticas, Montalegre
- Commissioning:

- 12 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Total nominal power: 28,200 kW
- Operational
- Onshore wind farm
- Operator: Ventient Energy
- Owner:

- Source:

- Source:

Production forecast
- From Friday, September 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.3 %
- Expected production: 2,250 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Boticas, Montalegre
- Commissioning:

- 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Total nominal power: 4,700 kW
- Operational
- Onshore wind farm
- Operator: Ventient Energy
- Owner:

- Source:

- Source:

Localisation
Part #1:
- Latitude: 41° 44' 29.4"
- Longitude: -7° 39' 12.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 41° 44' 29.4"
- Longitude: -7° 39' 12.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 December 2022