The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Bergheim (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Pulheim
  • Commissioning: 2011
  • 2 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
  • Hub height: 59 m
  • Total nominal power: 4,100 kW
  • Operational
  • Onshore wind farm

Part #2:

  • Part: Paffendorf
  • City: Bergheim
  • Commissioning: 2017
  • 2 turbines: Vestas V117/3300 (power 3 300 kW, diameter 117 m)
  • Hub height: 142 m
  • Total nominal power: 6,600 kW
  • Operational
  • Onshore wind farm
  • Developer: BMR
  • Source: http://www.energiekontor.de/en/references/wind-farms.html

Part #3:

  • Part: Rommerskirchen
  • City: Bergheim
  • Commissioning: 2003
  • 5 turbines: Enron 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 61 m
  • Total nominal power: 7,500 kW
  • Operational
  • Onshore wind farm
  • Developer: BMR
  • Operator: BMR
  • Owner: BMR
  • Source: http://www.bmr-energy.com/PDF/Referenzliste-Wind.pdf

       Production forecast

  • From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 32.5 %
  • Expected production: 58,510 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • Part: Rommerskirchen
  • City: Bergheim
  • Commissioning: 2005/06
  • 3 turbines: Repower MD77 (power 1 500 kW, diameter 77 m)
  • Hub height: 62 m
  • Total nominal power: 4,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Energiekontor
  • Operator: Energiekontor
  • Owner: Energiekontor
  • Source: http://www.energiekontor.de/en/references/wind-farms.html

       Production forecast

  • From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 38.7 %
  • Expected production: 41,760 kWh
  • Values from Weathernews Windcaster solution

Part #5:

  • Part: Wiedenfelder Höhe
  • City: Bergheim
  • Commissioning: 2017
  • 4 turbines: Vestas V117/3300 (power 3 300 kW, diameter 117 m)
  • Hub height: 117 m
  • Total nominal power: 13,200 kW
  • Operational
  • Onshore wind farm
  • Developer: BMR
  • Source: http://www.energiekontor.de/en/references/wind-farms.html

Localisation


Part #1:

  • Latitude: 51° 0' 50.1"
  • Longitude: 6° 43' 11.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Paffendorf
  • Latitude: 50° 57' 18.1"
  • Longitude: 6° 38' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Part: Rommerskirchen
  • Latitude: 51° 0' 52"
  • Longitude: 6° 42' 47.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Part: Rommerskirchen
  • Latitude: 51° 0' 47"
  • Longitude: 6° 42' 45"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Part: Wiedenfelder Höhe
  • Latitude: 50° 58' 27.4"
  • Longitude: 6° 38' 27.2"
  • Altitude: 125 m
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 6 August 2019
Complete/correct this sheet: