[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Osterwieck
 - Commissioning: 

 - 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
 - Hub height: 

 - Total nominal power: 3,050 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Badersleben
 - Commissioning: 

 - 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 4,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #3: 
- City: Dardesheim
 - Commissioning: 

 - 5 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 10,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #4: 
- City: Badersleben
 - Commissioning: 

 - 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 4,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #5: 
- City: Dardesheim
 - Commissioning: 

 - 6 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 12,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #6: 
- City: Dardesheim
 - Commissioning: 

 - 3 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #7: 
- City: Dardesheim
 - Commissioning: 

 - 3 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #8: 
- City: Osterwieck
 - Commissioning: 

 - 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
 - Hub height: 

 - Total nominal power: 3,050 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Osterwieck
 - Commissioning: 

 - 3 turbines: Lagerwey LW250-27 (power 250 kW, diameter 27 m)
 - Hub height: 

 - Total nominal power: 750 kW
 - Dismantled (2013/06)
 - Onshore wind farm
 
Part #10: 
- City: Huy
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #11: 
- City: Osterwieck
 - Commissioning: 

 - 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
 - Hub height: 

 - Total nominal power: 4,700 kW
 - Operational
 - Onshore wind farm
 
Part #12: 
- City: Huy
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #13: 
- City: Osterwieck
 - Commissioning: 

 - 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 
Part #14: 
- City: Osterwieck
 - Commissioning: 

 - 1 turbine: Enercon E112/6000 (power 6 000 kW, diameter 114 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 
Part #15: 
- City: Huy
 - Commissioning: 

 - 4 turbines: Micon M1500-600 (power 600 kW, diameter 43 m)
 - Hub height: 

 - Total nominal power: 2,400 kW
 - Dismantled
 - Onshore wind farm
 
Part #16: 
- Part: Bioenergie Nordharz
 - City: Dardesheim
 - Commissioning: 

 - 7 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 14,000 kW
 - Operational
 - Onshore wind farm
 - Operator: General Renewables GmbH
 
Part #17: 
- Part: Huy
 - City: Dardesheim
 - Commissioning: 

 - 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
Part #2: 
- Latitude: 51° 58' 51.3"
 - Longitude: 10° 51' 52.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 51° 59' 11.3"
 - Longitude: 10° 50' 32.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
- Latitude: 51° 58' 57.8"
 - Longitude: 10° 51' 55.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 51° 59' 27.1"
 - Longitude: 10° 49' 34"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 51° 59' 17.1"
 - Longitude: 10° 49' 39.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Latitude: 51° 59' 20.5"
 - Longitude: 10° 49' 44.1"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
Part #9: 
Part #10: 
Part #11: 
Part #12: 
Part #13: 
Part #14: 
Part #15: 
Part #16: 
- Part: Bioenergie Nordharz
 - Latitude: 51° 59' 29.1"
 - Longitude: 10° 50' 8.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #17: 
Update for this sheet: 15 September 2025
Complete/correct this sheet: