[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Altentreptow
 - Commissioning: 

 - 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Werder
 - Commissioning: 

 - 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
 - Hub height: 

 - Total nominal power: 3,050 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Werder
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Grapzow
 - Commissioning: 

 - 1 turbine: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
 - Hub height: 

 - Total nominal power: 2,350 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- Part: Grapzow
 - City: Altentreptow
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- Part: Grapzow
 - City: Altentreptow
 - Commissioning: 

 - 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
Part #2: 
- Latitude: 53° 42' 31.2"
 - Longitude: 13° 19' 56.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 53° 42' 32.2"
 - Longitude: 13° 19' 35.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
Part #5: 
Part #6: 
Update for this sheet: 24 June 2022
Complete/correct this sheet: