[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Heldrungen
- Commissioning:

- 5 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developer: PN Power Plants AG
- Source:

Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 28.4 %
- Expected production: 61,270 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Heldrungen
- Commissioning:

- 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:

- Total nominal power: 4,700 kW
- Operational
- Onshore wind farm
- Developer: Sabowind GmbH
- Source:

Part #3:
- City: Heldrungen
- Commissioning:

- 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Sabowind GmbH
- Source:

Part #4:
- City: Reinsdorf
- Commissioning:

- 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:

- Total nominal power: 3,050 kW
- Operational
- Onshore wind farm
- Developer: Sabowind GmbH
Localisation
Part #1:
- Latitude: 51° 19' 7.5"
- Longitude: 11° 15' 13.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 19' 7.5"
- Longitude: 11° 15' 13.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 19' 7.5"
- Longitude: 11° 15' 13.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 19' 7.5"
- Longitude: 11° 15' 13.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 November 2022
Complete/correct this sheet: