Wind farms
Bommelerwaard-A2 (Netherlands)| Bommelerwaard-A2 (Netherlands) |
|
| Operational (11,025 MW) |

| Country | Netherlands |
| County/Zone | Gelderland |
| Wind farm type | Onshore wind farm |

![]() | 7.35 MW commissioned |
![]() | 3.675 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owners |
![]() ![]() |
| Manufacturer |
|
| Site officiel | https://bommelerwaard-wind.nl/ |

| Operational | Nordex N117/3600 (x 3) |

![]() | |
![]() | |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 2x Nordex N117/3600 (power 3,600 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 7,350 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 51° 47' 2.8" - Longitude 5° 15' 50.7" |
| Precise localization | Yes |
| City | #ND |
| Commissioning | ![]() |
| Turbine | 1x Nordex N117/3600 (power 3,600 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 3,675 kW (uprated turbine) |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 51° 47' 2.8" - Longitude 5° 15' 50.7" |
| Precise localization | Yes |
Databases ![]() Netherlands (19.6 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Burgerwindpark A2 Lage Rooijen (5 km) Treurenburg (8 km) De Rietvelden (8 km) Deil (8 km) Avri (10 km) Waalwijk-Ecopark (16 km) Culemborg (17 km) Goyerbrug (22 km) Echteld (23 km) Autena (23 km) | ||
|
Insights Production capacity Netherlands : 11,792.0 MW (end of 2025) Gelderland : 252.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 18 January 2026 |
||