The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access Wind farms Druiberg (Germany)


Sign up    Log in    Search

[Back to previous page]

Germany wind farms file


Generalities

Details


Part #1:

  • City: Osterwieck
  • Commissioning:
  • 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
  • Hub height:
  • Total nominal power: 3,050 kW
  • Operational
  • Onshore wind farm

Part #2:

  • City: Badersleben
  • Commissioning:
  • 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #3:

  • City: Dardesheim
  • Commissioning:
  • 5 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #4:

  • City: Badersleben
  • Commissioning:
  • 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #5:

  • City: Dardesheim
  • Commissioning:
  • 6 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 12,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #6:

  • City: Dardesheim
  • Commissioning:
  • 3 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #7:

  • City: Dardesheim
  • Commissioning:
  • 3 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #8:

  • City: Osterwieck
  • Commissioning:
  • 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
  • Hub height:
  • Total nominal power: 3,050 kW
  • Operational
  • Onshore wind farm

Part #9:

  • City: Osterwieck
  • Commissioning:
  • 3 turbines: Lagerwey LW250-27 (power 250 kW, diameter 27 m)
  • Hub height:
  • Total nominal power: 750 kW
  • Dismantled (2013/06)
  • Onshore wind farm

Part #10:

  • City: Huy
  • Commissioning:
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

Part #11:

  • City: Osterwieck
  • Commissioning:
  • 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Hub height:
  • Total nominal power: 4,700 kW
  • Operational
  • Onshore wind farm

Part #12:

  • City: Huy
  • Commissioning:
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

Part #13:

  • City: Osterwieck
  • Commissioning:
  • 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm

Part #14:

  • City: Osterwieck
  • Commissioning:
  • 1 turbine: Enercon E112/6000 (power 6 000 kW, diameter 114 m)
  • Hub height:
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm

Part #15:

  • City: Huy
  • Commissioning:
  • 4 turbines: Micon M1500-600 (power 600 kW, diameter 43 m)
  • Hub height:
  • Total nominal power: 2,400 kW
  • Dismantled
  • Onshore wind farm

Part #16:

  • Part: Bioenergie Nordharz
  • City: Dardesheim
  • Commissioning:
  • 7 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height:
  • Total nominal power: 14,000 kW
  • Operational
  • Onshore wind farm
  • Operator: General Renewables GmbH

Part #17:

  • Part: Huy
  • City: Dardesheim
  • Commissioning:
  • 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
  • Hub height:
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm

Localisation


Part #1:


Part #2:

  • Latitude: 51° 58' 51.3"
  • Longitude: 10° 51' 52.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51° 59' 11.3"
  • Longitude: 10° 50' 32.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 51° 58' 57.8"
  • Longitude: 10° 51' 55.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 51° 59' 27.1"
  • Longitude: 10° 49' 34"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 51° 59' 17.1"
  • Longitude: 10° 49' 39.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 51° 59' 20.5"
  • Longitude: 10° 49' 44.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:


Part #9:


Part #10:


Part #11:


Part #12:


Part #13:


Part #14:


Part #15:


Part #16:

  • Part: Bioenergie Nordharz
  • Latitude: 51° 59' 29.1"
  • Longitude: 10° 50' 8.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #17:



Update for this sheet: 15 September 2025





The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page