The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access Wind farms Friedrichskoog (Germany)


Sign up    Log in    Search

[Back to previous page]

Germany wind farms file


Generalities

Details


Part #1:

  • City: Friedrichskoog
  • Commissioning:
  • 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm

Part #2:

  • City: Friedrichskoog
  • Commissioning:
  • 4 turbines: (manufacturer name not available)
  • Total nominal power: 19,200 kW
  • Operational
  • Onshore wind farm

Part #3:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 4,200 kW
  • Operational
  • Onshore wind farm
  • Operator: AVK

Part #4:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Vestas V39/500 (power 500 kW, diameter 39 m)
  • Hub height:
  • Total nominal power: 550 kW (uprated turbine)
  • Dismantled (2021/10)
  • Onshore wind farm

Part #5:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Nordtank NTK500/41 (power 500 kW, diameter 41 m)
  • Hub height:
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

Part #6:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Nordtank NTK300/31 (power 300 kW, diameter 31 m)
  • Hub height:
  • Total nominal power: 300 kW
  • Operational
  • Onshore wind farm

Part #7:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Nordex N80/2500 (power 2 500 kW, diameter 80 m)
  • Hub height:
  • Total nominal power: 2,500 kW
  • Operational
  • Onshore wind farm

Part #8:

  • City: Friedrichskoog
  • Commissioning:
  • 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Hub height:
  • Total nominal power: 4,700 kW
  • Operational
  • Onshore wind farm

Part #9:

  • City: Friedrichskoog
  • Commissioning:
  • 4 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Hub height:
  • Total nominal power: 9,400 kW
  • Operational
  • Onshore wind farm

Part #10:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Hub height:
  • Total nominal power: 2,350 kW
  • Operational
  • Onshore wind farm

Part #11:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E82/3000 (power 3 000 kW, diameter 82 m)
  • Hub height:
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm

Part #12:


Part #13:


Part #14:

  • City: Friedrichskoog
  • Commissioning:
  • 3 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 6,900 kW
  • Operational
  • Onshore wind farm
  • Operator: Rohde Solar GbR

Part #15:

  • City: Friedrichskoog
  • Commissioning:
  • 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm

Part #16:

  • City: Friedrichskoog
  • Commissioning:
  • 3 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Hub height:
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Denker&Wulf
  • Operator: Denker&Wulf
  • Owner:

Part #17:


Part #18:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Operator: Viktoriawind GmbH

Part #19:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

Part #20:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

Part #21:


Part #22:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
  • Hub height:
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

Part #23:

  • City: Friedrichskoog
  • Commissioning:
  • 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
  • Hub height:
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm

Part #24:

  • City: Friedrichskoog
  • Commissioning:
  • 4 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
  • Hub height:
  • Total nominal power: 2,000 kW
  • Dismantled (2022/03)
  • Onshore wind farm

Part #25:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
  • Hub height:
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

Part #26:

  • City: Friedrichskoog
  • Commissioning:
  • 4 turbines: Bonus B44/600 (power 600 kW, diameter 44 m)
  • Hub height:
  • Total nominal power: 2,400 kW
  • Operational
  • Onshore wind farm

Part #27:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Bonus B37/450 (power 450 kW, diameter 37 m)
  • Hub height:
  • Total nominal power: 450 kW
  • Operational
  • Onshore wind farm

Part #28:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
  • Hub height:
  • Total nominal power: 3,200 kW
  • Operational
  • Onshore wind farm

Part #29:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
  • Hub height:
  • Total nominal power: 3,400 kW
  • Operational
  • Onshore wind farm

Part #30:

  • City: Friedrichskoog
  • Commissioning:
  • 1 turbine: Nordex N90/2300 (power 2 300 kW, diameter 90 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

Localisation


Part #1:

  • Latitude: 54° 0' 36.8"
  • Longitude: 8° 55' 32.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 54° 0' 37.9"
  • Longitude: 8° 53' 52.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 54° 0' 37.9"
  • Longitude: 8° 53' 52.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 54° 0' 3.4"
  • Longitude: 8° 57' 20.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 53° 59' 50.5"
  • Longitude: 8° 54' 47.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 53° 59' 53.4"
  • Longitude: 8° 54' 28.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 54° 0' 9.2"
  • Longitude: 8° 56' 19.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 54° 0' 56.6"
  • Longitude: 8° 56' 5.7"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 54° 0' 54.7"
  • Longitude: 8° 55' 29.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #10:

  • Latitude: 53° 58' 52.2"
  • Longitude: 8° 56' 13.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #11:

  • Latitude: 53° 58' 24.4"
  • Longitude: 8° 55' 57.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #12:

  • Latitude: 54° 0' 53.4"
  • Longitude: 8° 54' 58.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #13:

  • Latitude: 53° 59' 4"
  • Longitude: 8° 55' 35.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #14:

  • Latitude: 53° 59' 47.8"
  • Longitude: 8° 56' 15"
  • Geodetic system: WGS84
  • Precise localization: no

Part #15:

  • Latitude: 54° 0' 23.7"
  • Longitude: 8° 55' 48.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #16:

  • Latitude: 54° 0' 44.4"
  • Longitude: 8° 54' 9.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #17:

  • Latitude: 54° 0' 10.4"
  • Longitude: 8° 32' 45.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #18:

  • Latitude: 54° 1' 15.6"
  • Longitude: 8° 55' 51.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #19:

  • Latitude: 53° 57' 42.4"
  • Longitude: 8° 55' 25.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #20:

  • Latitude: 53° 59' 9.8"
  • Longitude: 8° 56' 20.7"
  • Geodetic system: WGS84
  • Precise localization: no

Part #21:

  • Latitude: 54° 0' 42.3"
  • Longitude: 8° 54' 53.7"
  • Geodetic system: WGS84
  • Precise localization: no

Part #22:

  • Latitude: 54° 0' 3.4"
  • Longitude: 8° 57' 20.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #23:

  • Latitude: 53° 59' 54.1"
  • Longitude: 8° 55' 56.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #24:

  • Latitude: 53° 59' 54.1"
  • Longitude: 8° 55' 56.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #25:

  • Latitude: 54° 0' 1"
  • Longitude: 8° 56' 17.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #26:

  • Latitude: 54° 0' 39.2"
  • Longitude: 8° 46' 4.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #27:

  • Latitude: 54° 0' 39.2"
  • Longitude: 8° 46' 4.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #28:

  • Latitude: 54° 0' 21.1"
  • Longitude: 8° 56' 50.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #29:

  • Latitude: 54° 0' 44.4"
  • Longitude: 8° 54' 9.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #30:



Update for this sheet: 16 December 2024
Complete/correct this sheet:



The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page