Generalities
|
|
Details
Part #1:
- City: Bornstedt
- Commissioning:

- 4 turbines: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: MBBF
- Operator: Iberdrola Renewables
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 24.3 %
- Expected production: 35,000 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Allstedt
- Commissioning:

- 8 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 32.4 %
- Expected production: 93,380 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Bornstedt
- Commissioning:

- 5 turbines: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developer: MBBF
- Operator: MBBF
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 34.6 %
- Expected production: 62,310 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 27' 23.8"
- Longitude: 11° 28' 22.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 27' 6.4"
- Longitude: 11° 27' 53.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 27' 23.8"
- Longitude: 11° 28' 22.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0