Wind farms
Cleanrath (Ireland)| Cleanrath (Ireland) |
|
| Operational (46,2 MW) |

| Country | Ireland |
| County/Zone | Cork (Munster) |
| City | Cleanrath |
| Wind farm type | Onshore wind farm |

![]() | 14.4 MW commissioned |
![]() | 12 MW commissioned |
![]() | 19.8 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Nordex N100/3300 (x 6) |
| Operational | Nordex N117/2400 (x 5) |
| Operational | Nordex N117/3600 (x 4) |

![]() | |

| City | Cleanrath |
| Commissioning | ![]() |
| Turbines | 4x Nordex N117/3600 (power 3,600 kW, diameter 117 m) |
| Total nominal power | 14,400 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 52° 6' 46.1" - Longitude -9° 4' 21" |
| Precise localization | No |
| City | Cleanrath |
| Commissioning | ![]() |
| Turbines | 5x Nordex N117/2400 (power 2,400 kW, diameter 117 m) |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 52° 6' 46.1" - Longitude -9° 4' 21" |
| Precise localization | No |
| City | Cleanrath |
| Commissioning | ![]() |
| Turbines | 6x Nordex N100/3300 (power 3,300 kW, diameter 99.8 m) |
| Total nominal power | 19,800 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 52° 6' 46.1" - Longitude -9° 4' 21" |
| Precise localization | No |
Databases ![]() Ireland (11.3 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms WEDcross (12 km) Coomacheo Extension (12 km) Coomacheo (12 km) Gneeves (12 km) Glentanemacelligot (12 km) Carrigcannon (13 km) Caher Downey (13 km) Boggeragh (14 km) Knockduff (14 km) Carriganima (14 km) | ||
|
Insights Production capacity Ireland : 5,119.0 MW (end of 2025) Cork (Munster) : 821.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 19 March 2025 |
||