Generalities
|
|
Details
- City: Hannover
- Commissioning:

- 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developer: Windwärts
- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.5 %
- Expected production: 1,950 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 52° 19' 12"
- Longitude: 9° 50' 23.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 September 2017