[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Lünzen
- City: Schneverdingen
- Commissioning: 2002
- 4 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height: 65 m
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Operator: RWE
- Owner: RWE
Production forecast
- From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 38.3 %
- Expected production: 16,520 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Lünzen
- City: Schneverdingen
- Commissioning: 2004
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Operator: RWE
- Owner: RWE
Production forecast
- From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 39.9 %
- Expected production: 46,000 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Lünzen
- Latitude: 53° 4' 44.6"
- Longitude: 9° 46' 46.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Lünzen
- Latitude: 53° 4' 44.6"
- Longitude: 9° 46' 46.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 9 April 2019
Complete/correct this sheet: