Wind farms
Valdelón (Spain)| Valdelón (Spain) |
|
| Operational (18 MW) |

| Coordinates | Latitude 42° 39' 59.6" - Longitude -6° 16' 39.6" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() Spain (59.9 GW) Europe (667.0 GW) World (2,494.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Valdelón Ampliación (0 km) Peña del Gato (5 km) Valdelacasa (14 km) Argañoso (15 km) Espina (16 km) Valdelacasa III (18 km) San Pedro (ES) (18 km) El Redondal Fase 2 (18 km) El Redondal Fase 1 (18 km) Valdesamario (20 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 464.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 August 2026 |
||