Wind farms
Frestorf-Haustedt (Germany)| Frestorf-Haustedt (Germany) |
|
| Operational (3,6 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Stolzenau |
| Wind farm type | Onshore wind farm |

![]() | 1.3 MW commissioned |
![]() | 1.3 MW commissioned |
![]() | 1 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturers |
|

| Operational | Bonus B62/1300 (x 2) |
| Operational | Neg Micon NM60/1000 (x 1) |

![]() | |

| City | Stolzenau |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM60/1000 (power 1,000 kW, diameter 60 m) |
| Hub height | ![]() |
| Total nominal power | 1,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 29' 9.8" - Longitude 8° 59' 27.1" |
| Precise localization | Yes |
| City | Stolzenau |
| Commissioning | ![]() |
| Turbine | 1x Bonus B62/1300 (power 1,300 kW, diameter 62 m) |
| Hub height | ![]() |
| Total nominal power | 1,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 29' 27.7" - Longitude 8° 59' 45.5" |
| Precise localization | Yes |
| City | Stolzenau |
| Commissioning | ![]() |
| Turbine | 1x Bonus B62/1300 (power 1,300 kW, diameter 62 m) |
| Hub height | ![]() |
| Total nominal power | 1,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 29' 27.7" - Longitude 8° 59' 45.5" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Stolzenau (1 km) Auf dem Acker (1 km) Schlüsselburg (4 km) Uchte (6 km) Mensinghausen II (6 km) Mensinghausen I (6 km) Mensinghausen III (6 km) Bruchhagen (6 km) Lohhof (7 km) Höfen (Niedersachsen) (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 December 2024 |
||