Part #1: 
- City: Eisenach
 - Commissioning: 

 - 1 turbine: Vensys 62 (power 1 200 kW, diameter 62 m)
 - Hub height: 

 - Total nominal power: 1,200 kW
 - Operational
 - Onshore wind farm
 - Developer: GE Green Energy
 
Part #2: 
- City: Eisenach
 - Commissioning: 

 - 2 turbines: Vensys 77 (power 1 500 kW, diameter 76.8 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 - Developer: GE Green Energy
 
Part #3: 
- City: Eisenach
 - Commissioning: 

 - 2 turbines: Enercon E48/800 (power 800 kW, diameter 48 m)
 - Hub height: 

 - Total nominal power: 1,600 kW
 - Operational
 - Onshore wind farm
 - Developer: GE Green Energy
 
Part #4: 
- City: Eisenach
 - Commissioning: 

 - 1 turbine: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
 - Hub height: 

 - Total nominal power: 1,500 kW
 - Operational
 - Onshore wind farm
 - Developer: BOREAS
 - Source: 

 
Part #5: 
- City: Eisenach
 - Commissioning: 

 - 1 turbine: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
 - Hub height: 

 - Total nominal power: 1,500 kW
 - Operational
 - Onshore wind farm
 - Developer: BOREAS
 - Source: 

 
Part #6: 
- City: Eisenach
 - Commissioning: 

 - 2 turbines: Nordex N62/1300 (power 1 300 kW, diameter 62 m)
 - Hub height: 

 - Total nominal power: 2,600 kW
 - Operational
 - Onshore wind farm
 - Developer: BOREAS
 - Source: 

 
Part #7: 
- City: Eisenach
 - Commissioning: 

 - 3 turbines: Repower MM82 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 - Developer: GE Green Energy
 
Part #8: 
- City: Eisenach
 - Commissioning: 

 - 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
 - Hub height: 

 - Total nominal power: 800 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Eisenach
 - Commissioning: 

 - 6 turbines: Vestas V136/3450 (power 3 450 kW, diameter 136 m)
 - Hub height: 

 - Total nominal power: 20,700 kW
 - Operational
 - Onshore wind farm
 - Developer: BOREAS
 - Source: 

 
Part #10: 
- City: Eisenach
 - Commissioning: 

 - 2 turbines: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
 - Hub height: 

 - Total nominal power: 8,400 kW (uprated turbines)
 - Operational
 - Onshore wind farm
 - Developer: BOREAS
 - Source: 

 
Part #11: 
- Part: Uütteroda
 - City: Krauthausen
 - Commissioning: 

 - 1 turbine: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
 - Hub height: 

 - Total nominal power: 4,200 kW (uprated turbine)
 - Operational
 - Onshore wind farm
 - Developer: BOREAS
 - Source: 

 
Localisation
Part #1: 
Part #2: 
Part #3: 
Part #4: 
Part #5: 
Part #6: 
Part #7: 
Part #8: 
Part #9: 
Part #10: 
- Latitude: 51° 2' 21.1"
 - Longitude: 10° 19' 23.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #11: 
- Part: Uütteroda
 - Latitude: 51° 2' 5.9"
 - Longitude: 10° 18' 46.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 30 October 2023
Complete/correct this sheet: