[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Friday, September 22 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 20.9 %
- Expected production: 11,550 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Commissioning:

- 5 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Friday, September 22 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 24.1 %
- Expected production: 57,760 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 41' 30.2"
- Longitude: -7° 50' 35"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 41' 30.2"
- Longitude: -7° 50' 35"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 December 2022
Complete/correct this sheet: